The Geelong Leisurelink Aquatic Centre is a landmark facility developed on a challenging greenfield site, designed to serve as a major regional hub for aquatic recreation and wellness. The centre features a comprehensive suite of aquatic amenities, including an indoor 50m pool, leisure pool, warm water exercise pool, spa pool, and an indoor waterplay garden fitted with multiple Aquaplay features and two large waterslides.

 

A unique aspect of the project was the repurposing of the 2007 FINA World Swimming Championships indoor 50m pool, originally housed in Rod Laver Arena. This modular pool system was successfully transplanted and integrated into the Leisurelink site, showcasing sustainable reuse of high-performance infrastructure.

 

Furthermore, in 2022, Creo led a major upgrade of the facility, replacing the original 50m modular pool with a new in-ground concrete pool and delivering an upgraded fully integrated filtration system. This upgrade significantly enhanced the centre’s durability, water quality, and user experience, reaffirming Leisurelink’s status as one of Victoria’s premier aquatic destinations.